Planning run line sources

The demand that originates a planning run line, through one path of the bill of materials.

Fields

The API name is what the API, MCP and the CLI use.

NameAPI nameTypeRequiredDescription
IDidRecord IDYes
Line itemmanufacturingplanningrunitemIdReferenceYes
Gross requirementquantityGrossQuantityYesQuantity in the catalog unit after any unit conversion on the line.
Uncovered quantityquantityUncoveredQuantityYesQuantity in the catalog unit after any unit conversion on the line.
Bill of materialsbillofmaterialIdReference
Source typetypeSourceTextYes
Date requireddateRequiredDateCalendar date without time of date.
BOM pathbomPathKeyTextYes
Root source typetypeRootSourceTextYes
Created atcreatedAtDate and TimeYes

Relations

Owned records (solid line) are deleted with their owner. Grouped records (dashed line) can exist alone.

Planning run line sourcesPlanning run line items
FieldPoints toKind
Line item manufacturingplanningrunitemIdPlanning run line itemsowned by
Bill of materials billofmaterialIdBills of materialsreference