Manufacturing
Manufacturing execution — orders, material requirements, consumption, outputs, work orders, capacity, and shop-floor state. Routings and BOMs live in engineering.
| Name | Description |
|---|---|
| Manufacturing cut outputs | A piece, remnant or scrap that results from a cut. |
| Manufacturing cuts | The cutting of an inventory item into pieces, remnants or scrap. |
| Manufacturing downtimes | A period in which a work center is stopped, with its reason and an optional manufacturing or maintenance order. |
| Manufacturing order materials | A material line of a manufacturing order, with the product item and quantity to consume. |
| Manufacturing order operations | A routing operation of a manufacturing order, with planned setup and run hours. |
| Manufacturing order outputs | The good and scrapped quantity produced by a manufacturing order on one production date. |
| Manufacturing orders | A work order that states what to produce and by when, with its materials, operations and output. |
| Planning run line items | A line of a planning run with the proposed quantity to make or buy of one product or custom item. |
| Planning run line sources | The demand that originates a planning run line, through one path of the bill of materials. |
| Planning runs | A material plan for one manufacturing site. |
| Manufacturing time entries | The machine and labor hours spent on a work center of a manufacturing order on one production date. |